Photographer essays campus construction

Work crew in front of the tech mall
Work crew in front of the tech mall

Sanchez

GROSSMONT COLLEGE–The construction tableau changes from week-to-week, even from day-to-day as work crews rebuild, refurbish and revitalize the campus.  Photographer Bobby Sanchez took a walk on campus last week to check out the progress.   Here’s what he saw.   If you walk on campus today, you can see changes even from these photos.

All the mess that lines the back part of the Cafeteria. You can also find this yellow caution tape around the side of the quad in font of the book store.

All the mess that lines the back part of the Cafeteria. You can also find this yellow caution tape around the side of the quad in front of the book store.

 

Cafeteria zone 1

Cafeteria zone 1

Cafeteria zone 2

Cafeteria zone 2

Machines parked in walking area in font of tech mall. Shovels and other tools laying around walking area.

Machines parked in walking area in front of tech mall. Shovels and other tools laying around walking area.

Mod-village (the temporary set-up for much of the campus administration)

Mod-village (the temporary set-up for much of the campus administration)

The dirt highway

The dirt highway

The long walk to mod-villiage

The long walk to mod-village

What use to be the front of the cafeteria and ASGC building, now trenches and piles of dirt

What used to be the front of the cafeteria and ASGC building, now trenches and piles of dirt

*Sanchez is a student photographer; email him at bobbys@gcsummit.com

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: